Building Management Australia · Cleaning & Waste

Welcome to Eclipse

Our cleaning and waste management proposal for 1 Adelaide Street, Bondi Junction. Prepared for the Owners Corporation, SP 65372.

Step inside
Building Management Australia · Cleaning & Waste

A cleaner Eclipse, floor by floor.

1 Adelaide Street, Bondi Junction NSW · Prepared for the Owners Corporation, SP 65372

Ground floor Garbage room Level 2 amenities November 2026
3
Priority zones
0
High-touch points cleaned daily
4
Bin streams presented each week
5
Service frequencies, daily to 6-monthly
B1B2B3 Residentiallevels Level 2Pool · gym · bathroom GroundFoyer · lifts · WC Garbageroom Rubbishchute
02 The brief

Three zones carry the building's first impression.

Residents judge a building at the front door, at the bin room and at the pool. We have broken the Eclipse scope into these three zones, each with its own checklist, touch points and rhythm.

03 Zone 1

Ground floor. The first thirty seconds.

Every resident and visitor walks through here. The foyer sets the standard for the whole building, so it gets the most attention and the most touch-point cleaning. Hover or tap a task to find it in the foyer.

ENTRY ECLIPSE G ▲ 2 ▼ WC
04 Example in practice

How we clean a door handle.

Small surfaces, high traffic. Door handles, push plates, lift buttons and intercoms are where germs move between residents. This is the routine every Eclipse cleaner follows on every touch point.

STEP 1

Spray the cloth

Disinfectant goes onto a folded microfibre cloth, never straight onto the handle. No drips, no residue.

STEP 2

Wipe every face

Top, underside and back plate, then the surrounding push zone. The underside is where fingers actually grip.

STEP 3

Let it work

The surface stays wet for the product's stated contact time. That dwell is what actually kills germs.

STEP 4

Buff and log

Buffed dry with a fresh cloth, then the round is ticked off on the QR checklist so the Building Manager can see it was done.

Colour-coded microfibre. Red never leaves the toilet.

RedToilets and urinals only
YellowBasins, taps and washroom surfaces
BlueFoyer, lifts, glass and handles
GreenGym equipment and amenity areas
05 Zone 2

Garbage room. From chute to kerb and back.

Rubbish arrives from every floor through the chute. Our job is to keep it moving, keep the room clean and dry, and have every bin ready for council on time. Then we wash the bins and the floor so the room never smells.

1 ChuteRubbish from everylevel arrives here 2 Rotate & relineRotate compactor bins,clear loose rubbish 3 SortFlatten cardboard,right stream, right bin 4 PresentAll four streams outThursday morning 5 CollectionCouncil empties bins;we keep access clear 6 Wash & returnBins and floor washed,lids wiped, bins home EVERY DOOR, LID AND HANDLE ON THE WAY IS WIPED DOWN

Four streams, presented on time.

Hover or tap a bin. Stream allocation and collection day confirmed against the council schedule at mobilisation.

Example waste week

Collection shown on Thursday, as set out in the tender.

06 Zone 3

Level 2. Pool, gym and bathroom.

This is where residents spend their own time, often barefoot. Wet areas need to be safe, glass needs to be clear and gym equipment needs to be wiped where hands and skin touch it. The dotted line is the daily vacuum route.

BIN POOL & SURROUNDS GYM BATHROOM LIFT LOBBY & CORRIDOR
07 Breaking it down

Where the cleaning time goes.

The ground floor takes the largest share because it is the busiest and most visible. The garbage room needs steady daily attention plus a heavy collection day. Level 2 is wet-area work that has to be done carefully.

Share of daily effort

Indicative split, refined after the site audit.

High-touch points per zone

Surfaces disinfected every service day.

08 Frequencies

What happens daily, weekly and beyond.

Daily work keeps the building presentable. Weekly and periodic work stops grime building up on glass, stone, vents and stairs. Every frequency below comes from the Eclipse scope.

09 Example shift

A day on site at Eclipse.

A typical sequence for the onsite cleaner. Busy areas are done early, before residents leave for work. Thursday changes shape around the council collection. Exact times are set with the Building Manager at mobilisation.

Ground floor Garbage room Level 2 Admin & checks
10 Accountability

Checked, recorded and reported.

Every visit is QR-logged. A Cleaning Supervisor inspects the work, Senior Management reviews it, and anything outside the cleaning scope is reported to the Building Manager the same day.

Eclipse SERVICE CYCLE
11 Next steps

From tender to a clean building.

Once the committee is ready, we walk the building, lock in the task matrix and start with a team that already knows Eclipse.

Building Management Australia · Independent. No secret commissions or referral fees. Cleaning & Waste Management Proposal · Eclipse, SP 65372